The Goods
Here is what I started with.
Date: 08/31/2006
Views: 146
|
Plates
Got a late start the first day. So I just laid out the plates and marked them for the studs.
Date: 08/31/2006
Views: 132
|
Plates 2
Here you can get a feel for the size of the bathroom.
Date: 08/31/2006
Views: 155
|
|
The Studs
I bought the precut 92 5/8 in studs so I could save the time of cutting my own.
Date: 09/01/2006
Views: 121
|
Southeast Corner
The first 2 sections of walls. I was going to do the entire East wall in one piece, but I was working alone and that wall is 18' 8" long. I figured it would be easier to raise it in sections.
Date: 09/01/2006
Views: 154
|
Blocking
The walls would be pleanty strong alone, but I wanted to make sure it was going to last a long time. So I blocked it to the steel.
Date: 09/01/2006
Views: 154
|
|
Framing done
Here is a shot of all the framing done. Well, at least the bathroom. There is still more walls to go in later.
Date: 09/01/2006
Views: 163
|
Another angle of framing
Here is the completed framing from another angle. I also noticed that in this photo, it looks like I used non-pressure treated wood for the plate on the West wall. But that is just a 2X6 laying on the floor. All plates are PT.
Date: 09/01/2006
Views: 134
|
Ceiling
Here it is with the ceiling on. That thing was HEAVY! I used blocking, rope and my engine hoist to get it up there.
Date: 09/01/2006
Views: 161
|