Each time we update the news on the lead page, the old stuff gets put away. Well, this page is away. You can come here to read back as far as you would like. (Well, at least back to the beginning of us typing it.

02/03/2012
We are so close now I can smell it. I have to paint the porch ceilings, make a landing outside the service door, set a couple tiles in the shower and we can apply for the final inspection. It has been a long road, but well worth it.

03/17/2011
The electrical downstairs is completed except for ceiling fans. The kitchen cabinets are all installed. The refrigerator, dishwasher, and cooktop are all installed. Laminate flooring is complete. We are moving along well.

12/09/2010
Drywall is all completed. So far the only issue I have found is that they missed cutting out the a/c vent in the main bath. They will have to return to fix that. Painting is well under way and all of the kitchen cabinets have been installed. The counter top company has templated the counters and have been given the approval to proceed. Still have some painting to do. Flooring in the main part of the house will be coming soon as well.

Navigation:
Next Last

The news on this page is added at random times. It is entered when we feel there is something worth sharing or something we want on the record.

 

All Information And Photos On This Site Are ©Copyright Of Their Owners. All Others are ©Copyright 2005 GShelton.